Saturday, December 21, 2024

2016 Paving

PavingThis past 2016 spring/summer, we resurfaced the Woodlands Subdivision in the southeast section of Palatine Township. Roadways were surveyed for drainage concerns, milled, patched and new asphalt, surface course was placed. These roadways included Briarwood, Brookdale, Linden and Thorntree Lanes and Brookdale Courts. We installed new high intensity prismatic traffic signs to provide better retro-reflectivity of sight. Additionally, street name signs were updated according to the Manual on Uniform Traffic Control Devices (MUTCD).

Paving 2016 Map